This is a step-by-step guide for installing styroliner
![]() |
Fixing techniqueUses the principle of Gyproc Dri-Wall Adhesive dabs to bond Panel Systems Styroliner directly to masonry walls. |
![]() |
Installing 1200mm wide StyrolinerDetermine high spots on the wall and plumb position to the ceiling and floor. |
![]() |
Transfer of dimension to cornerTransfer this dimension to the room corners, add an allowance of 10mm plus the Styroliner thickness and strike continuous chalk lines on the floor and ceiling. |
![]() |
Plan and indicate positioningMark wall with lines at 1200mm centres to indicate board positioning. |
![]() |
Apply the adhesiveTrowel apply a continuous fillet of Gyproc Dri-Wall Adhesive to the perimeter of the wall, services and openings where required. Commence dry lining from a window/door reveal or internal angle. Trowel apply adhesive to form dabs 50mm to 75mm wide and about 250mm long. |
![]() |
Apply at ceiling levelPosition dabs of Gyproc Dri-Wall Adhesive in threevertical rows to receive each board. Apply intermediate dabs at ceiling level. Apply a continuous band of GyprocDri-Wall Adhesive at skirting level. NB: Ensure that the dabs adjacent to a board joint are approximately 25mm in from the edge to avoid bridging the joint. |
![]() |
Apply at skirting levelApply a continuous band of Gyproc Dri-Wall Adhesive at skirting level. |
![]() |
Cut your styroliner, keeping it a little shortCut Styroliner 15mm short of the floor to ceiling height. Position the first board, insulation face against the dabs, with the bottom edge resting on plasterboard packing strips. |
![]() |
Press against wall, and tap slightlyTap the Styroliner back firmly using a straight-edge until it aligns with the ceiling and floor lines. |
![]() |
Tighten up at the ceilingGently lift using a footlifter until the Styroliner is tight against the ceiling. Insert additional packing strips at the base to wedge the board in place and remove the footlifter. Apply dabs for the next Styroliner board and continue the drylining with laminates lightly butted. At internal angles cut Styroliner to fit and position the cut edge to the angle. |
![]() |
Insulation backingAt reveals and external angles run the lining past the corner and cut back the insulating backing so as to form a neat junction with the reveal board or wall lining. |
![]() |
Window revealsUse thinner board thicknesses for for the window reveals. |
![]() |
Attach to the wallWhen the dabs have set, install Gyproc Nailable Plugs to provide secondary mechanical fixings. Insert two plugs per board, 15mm in from each edge at mid-height. Select plugs of sufficient length to give a 25mm nominal penetration into the solid wall and drill hole 5mm longer than the plug. Drive each plug in until the head is slightly below the liner without fracturing it. |